Three Unhealthy Approaches To Writing PRDs, and Repair Them. | by Vladimir Kalmykov | Apr, 2024


Let’s look at some improper methods to jot down a Product Necessities Doc (PRD) and suggest three steps to repair it.

One of the primary duties of a PM is to know what clients or customers want and, along with the event workforce, construct an answer for these necessities.

There’s a bridge within the center — a transparent and concise doc that aligns everybody with a PM’s considering. This doc is named PRD (Product Necessities Doc). Regardless of the flamboyant time period, these are simply solutions to the primary “energy” questions.

  • What’s the Enterprise Drawback?
  • What are the constraints?
  • What and when will we do?
  • Who does what?

This construction is utilized in all huge firms: Uber, Reserving, Spotify, Amazon, Google, and so forth. Since dozens of initiatives/options are launched in these firms concurrently, the magic of a one-pager PRD doc permits everybody, from a developer to the CEO, to know what is going on. Effectively, let’s see what can go improper right here.

Try #1

Think about you begin studying this PRD within the IT division of an airline:

Drawback: in Q3 we have to exchange the outdated e mail notification system with a brand new one.
<Particulars: constraints/what/who>

See the issue with this “drawback”? If you wish to observe, cease right here and check out giving suggestions to the Junior PM who introduced it to you.

No, actually, assume for 20 seconds not less than 😊.

Okay, so as a substitute of a enterprise drawback, the creator of this PRD is attempting to provide us an answer and exchange the complicated query “why” with a less complicated query “what.” This small textual content substitute has two risks.

Firstly, the corporate may spend a yr or much more on a change that nobody wants. Not all outdated programs are dangerous; numerous deep banking and aviation software program work on code from the 80s.

Secondly, predefined “what” kills the creativity of the workforce within the growth and product departments. In any case, maybe there are different options to the identical drawback, and a few of them is likely to be extra environment friendly and sooner, however they’re mechanically discarded for the reason that “right” one has already been chosen by a product supervisor.

Try #2

After getting some recommendation, the JPM comes again with the up to date PRD:

Drawback: In Q3, we have to enhance the conversion of message supply: now lots of them don’t attain passengers.
<Particulars: constraints/what/who>

What do you concentrate on that one? Be at liberty to cease right here for a second to consider a doable reply.

This formulation of the issue is a lot better: not less than the query “why” is clearly seen, however one thing continues to be lacking. It appears to lack numbers and reference to enterprise: what’s “quite a bit?” Is 100 quite a bit? What about 1000? Per day or month? This drawback definition wants some extra enchancment.

Try #3

Right here is an replace:

Drawback: In Q3, we have to enhance the message supply conversion fee: now about 10% of messages per day don’t attain passengers.
<Particulars: constraints/what/who>

Now we’re speaking! Are you prepared to start out creating based on such necessities?

Personally, I’m not prepared but. After all, it’s unhappy that 10% of messages are misplaced, however we’re an airline, not WhatsApp. How a lot does this have an effect on the primary enterprise metrics of our product? How many individuals name us and yell at assist brokers? What number of missed their flight, and do we have now to cope with the re-issuance? What number of of these 10% of customers cancel their flights?

Or perhaps these 10% don’t want notifications in any respect: they purchased a ticket, added it to the calendar, and forgot about it till they arrived on time for his or her flight? Then why would we waste time updating the system? There are (all the time) extra necessary issues to do.

Try #4

Our JPM tries onerous and appears to be getting there:

Drawback: In Q3, we have to enhance the conversion of message supply: now about 10% per day don’t attain passengers. About 24% of those passengers name assist, which masses it as much as a peak of 85%. Furthermore, 2% of passengers find yourself canceling their journey. Lastly, within the earlier quarter, we needed to litigate in 16 instances (claims for lacking flights attributable to absence of affirmation).
<Particulars: constraints/what/who>

Now our JPM had it proper! We will clearly see the issue: our “solely” 10% of undelivered messages result in severe penalties for companies.

The remainder of the PRD

We simply solved the primary half — the enterprise drawback. The remainder of the PRD requires you to assume by the causes of this drawback and potential options.

  • Perhaps you want only a easy bug repair in an outdated system (then cease writing PRD and add a JIRA ticket as a substitute).
  • Perhaps you have to put money into a retry mechanism. Okay, then record your necessities — how typically you need to retry, after how a lot ready, and so forth.
  • Or perhaps you want an entire new system, then record all of the options you need to see there.

Final verify: socialize your thought

Earlier than you begin implementing the answer, cross-check your concepts with different departments. Issues can shock you even right here!

It might occur that your air supply division has simply developed a brand new system for his or her wants (notification to floor supply providers). You may understand the dream of a software program architect and reuse a single system for 2 instances. Programmers have closed their eyes with pleasure now, and I, a developer previously, too 🙂

Or perhaps your organization has extra severe issues (for instance, the pricing platform is damaged), after which your boss / CEO will ask you to change your consideration and growth there.

A brief and clear PRD helps everybody (developer, fellow PM, shopper, designer, tester, supervisor, CEO) to know the issue in 5 minutes and make choices at their very own ranges.

Word how essential it’s to outline the start of it (product drawback) proper and keep away from the three commonest PRD risks: 1. As an alternative of the issue, PM states the answer instantly. 2. The issue is just not quantified. 3. The chosen metric of an issue measurement doesn’t mirror the precise drawback measurement.